The Castle 10

A model of the Castle 8.
Students: 2016 Advanced Design Research 1 and 2
Project partner: Youth Futures Inc.

The current iteration of The Castle has been commissioned by Housing Tasmania.

The priorities for C10 have been to achieve a high level of thermal comfort, fully autonomous servicing, and to optimise level flexible floor space.

The spatial organisation incorporates the successful characteristics of previous iterations, including the fold-down deck, a large corner window, dual sleeping lofts and a modest slide-out.