Courses & Units

Music Industry Project 3A FCI301

Hobart

Note:

Negotiated projects should represent authentic engagement with the Australian independent music industries and will require extensive work outside of staff-contact hours.

Enrolment in this unit is required to be approved. Please contact the coordinator.

Introduction

Music Industry Projects 3A is devoted to developing students' professional practice in the independent music industries. Students will engage in project based learning activities around the commercial performance, recording, promotion and distribution of original musical works. This unit sees students develop and undertake complex, self-directed music industry projects negotiated with and overseen by teaching staff.

Summary

Unit name Music Industry Project 3A
Unit code FCI301
Credit points 25
Faculty/School College of Arts, Law and Education
School of Creative Arts
Discipline Music
Coordinator

Dr Dave Carter

Teaching staff

TBA

Level Advanced
Available as student elective? Yes
Breadth Unit? No

Availability

Location Study period Attendance options Available to
Hobart Semester 1 On-Campus International Domestic
Hobart Semester 2 On-Campus International Domestic
Hobart Summer school On-Campus International Domestic
Hobart Winter school On-Campus International Domestic
Hobart Spring school On-Campus International Domestic

Key

On-campus
Off-Campus
International students
Domestic students
Note

Units are offered in attending mode unless otherwise indicated (that is attendance is required at the campus identified). A unit identified as offered by distance, that is there is no requirement for attendance, is identified with a nominal enrolment campus. A unit offered to both attending students and by distance from the same campus is identified as having both modes of study.

Special approval is required for enrolment into TNE Program units.

TNE Program units special approval requirements.

Key Dates

Study Period Start date Census date WW date End date
Semester 1 26/2/2018 23/3/2018 16/4/2018 3/6/2018
Semester 2 16/7/2018 10/8/2018 3/9/2018 21/10/2018
Summer school 1/1/2018 12/1/2018 29/1/2018 25/2/2018
Winter school 4/6/2018 13/6/2018 25/6/2018 15/7/2018
Spring school 22/10/2018 7/11/2018 29/11/2018 6/1/2019

* The Final WW Date is the final date from which you can withdraw from the unit without academic penalty, however you will still incur a financial liability (see withdrawal dates explained for more information).

Unit census dates currently displaying for 2018 are indicative and subject to change. Finalised census dates for 2018 will be available from the 1st October 2017.

About Census Dates

Fees

Domestic

Band CSP Student Contribution Full Fee Paying (domestic) Field of Education
1 2017: $1,587.00 2017: $4,414.00 100101

Fees for next year will be published in October. The fees above only apply for the year shown.

Please note: international students should refer to this page to get an indicative course cost.

Requisites

Prerequisites

FCI202

Teaching

Teaching Pattern

Directed Project Work and Tutorials equivalent to 80 hours contact time

Assessment

Project Report: 50%      Project Plan: 20%       Tutor's assessment of project progress work: 30%

The project report documents the project and critically reflects on the outcome, with reference to the project plan. It provides a summative assessment mechanism for the outcome of each project.

The project plan is intended as a formative assessment that requires the student to articulate what they're trying to achieve with their project; identify the project deliverables; and develop a timeline for successful creation / realisation of these deliverables.

TimetableView the lecture timetable | View the full unit timetable

Textbooks

RequiredNone
Co-op Bookshop links

The University reserves the right to amend or remove courses and unit availabilities, as appropriate.