Introduction
This unit will provide you with experience in preparing quotations and tender documentation based on identified quantities, and cost planning as a means to control costs during a construction project. You will develop your financial literacy through applied activities; you will learn about the differences between time-related, quantity-related and fixed costs, and how these relate to calculating margins for profits and overheads. You will apply and analyse common methods for presenting quantity and cost information will be discussed, and you will become familiar with methods commonly used to report on cost control over the life of a construction project. You will critically reflect on your knowledge and skills in cost planning and management and develop a professional development plan to continually improve your financial management knowledge and skills.
Summary 2020
Unit name | Cost Planning |
---|---|
Unit code | ZAX102 |
Credit points | 12.5 |
Faculty/School | University College |
Discipline | Applied Technologies |
Coordinator | TBA |
Available as student elective? | No |
Breadth Unit? | No |
Availability
Note
Please check that your computer meets the minimum System Requirements if you are attending via Distance/Off-Campus.
Units are offered in attending mode unless otherwise indicated (that is attendance is required at the campus identified). A unit identified as offered by distance, that is there is no requirement for attendance, is identified with a nominal enrolment campus. A unit offered to both attending students and by distance from the same campus is identified as having both modes of study.
Special approval is required for enrolment into TNE Program units.
TNE Program units special approval requirements.
* The Final WW Date is the final date from which you can withdraw from the unit without academic penalty, however you will still incur a financial liability (see withdrawal dates explained for more information).
Learning Outcomes
1. Explain the main methods currently used for cost planning for Australian construction projects.
2. Apply and evaluate techniques to determine costs for labour, materials and equipment in construction projects.
3. Apply and evaluate techniques currently used by construction contractors to present cost information for quotation and tender documentation.
4. Apply and evaluate techniques currently used by construction contractors to manage and report on costs during project work.
5. Reflect on and plan self-learning to continuously up-date cost planning and management skills and knowledge.
Fees
Teaching
Assessment | 1. Quizzes (20%) 2. Cost estimate and cost plan report (40%) 3. Project cost review (40%) |
---|---|
Timetable | View the lecture timetable | View the full unit timetable |
Textbooks
Required | None |
---|
The University reserves the right to amend or remove courses and unit availabilities, as appropriate.