This unit provides students with knowledge and understanding of key aspects of electricity grid codes, rules and connection standards. Students will learn how legislation and regulation are used to create rules by which electricity grids must be planned and operated within, and are used to define the requirements of new grid connections, in particular new solar and wind generators, and new energy storage projects. Students will become familiar with grid codes used in key international power systems, but will focus on the Australian National Electricity Rules (NER) and its use in governing expansion of transmission and distribution networks and connection of new generators. Students, by undertaking grid connection studies, will understand generator performance standards and will gain sufficient knowledge of the process and requirements for gaining network access by new generators, energy storage projects, and energy consumers under Chapter 5 of the NER.
Summary
| Unit name | Electricity Grid Codes |
| Unit code | ENG409 |
| Credit points | 12.5 |
| College/School | Sciences and Engineering School of Engineering |
| Discipline | Engineering |
| Coordinator | Professor Michael Negnevitsky |
| Delivered By | University of Tasmania |
| Level | Honours |
Availability
| Location | Study period | Attendance options | Available to | ||
|---|---|---|---|---|---|
| Hobart | Semester 2 |
|
|
|
|
- Key:
On-campus
Off-Campus
International students
Domestic students
Note
Please check that your computer meets the minimum System Requirements if you are attending via Distance/Off-Campus.
Units are offered in attending mode unless otherwise indicated (that is attendance is required at the campus identified). A unit identified as offered by distance, that is there is no requirement for attendance, is identified with a nominal enrolment campus. A unit offered to both attending students and by distance from the same campus is identified as having both modes of study.
Key Dates
| Study Period | Start date | Census date | WW date | End date |
|---|---|---|---|---|
| Semester 2 | 5/7/2026 | 27/7/2026 | 30/8/2026 | 24/10/2026 |
* The Final WW Date is the final date from which you can withdraw from the unit without academic penalty, however you will still incur a financial liability (refer to How do I withdraw from a unit? for more information).
Unit census dates currently displaying for 2026 are indicative and subject to change. Finalised census dates for 2026 will be available from the 1st October 2025. Note census date cutoff is 11.59pm AEST (AEDT during October to March).
Learning Outcomes
- Explain to specialists and non-specialists how electricity grid codes impact the management and expansion of power systems, and connection of new generators and energy consumers.
- Evaluate the capabilities of new generators and energy storage systems against appropriate generator performance standards.
- Define appropriate grid connection study requirements to assess new network connections, using Chapter 5 of the Australian National Electricity Rules (NER) .
- Evaluate new generator compliance with grid codes using industry standard software.
Fee Information
| Field of Education | Commencing Student Contribution 1,3 | Grandfathered Student Contribution 1,3 | Approved Pathway Course Student Contribution 2,3 | Domestic Full Fee 4 |
|---|---|---|---|---|
| 031301 | $1,192.00 | $1,192.00 | not applicable | $3,401.00 |
- Available as a Commonwealth Supported Place
- HECS-HELP is available on this unit, depending on your eligibility3
- FEE-HELP is available on this unit, depending on your eligibility4
1 Please refer to more information on student contribution amounts.
2 Please refer to more information on eligibility and Approved Pathway courses.
3 Please refer to more information on eligibility for HECS-HELP.
4 Please refer to more information on eligibility for FEE-HELP.
If you have any questions in relation to the fees, please contact UniConnect or more information is available on StudyAssist.
Please note: international students should refer to What is an indicative Fee? to get an indicative course cost.
Requisites
Prerequisites
ENG306 Power Electronics|ENG333 Power Systems 1Teaching
| Assessment | 2 x assignments (50%)|Major project: report and presentation (50%) |
|---|---|
| Timetable | View the lecture timetable | View the full unit timetable |
Textbooks
| Required |
Required readings will be listed in the unit outline prior to the start of classes. |
|---|
The University reserves the right to amend or remove courses and unit availabilities, as appropriate.